Motorists are advised of changed traffic conditions on the Princes Highway south of Bodalla from next week for maintenance work to be carried out south of Whittakers Creek.
Subscribe now for unlimited access.
$0/
(min cost $0)
or signup to continue reading
Single lane closures will be in place with stop/slow traffic control while 1.4 kilometres of road is resurfaced with a high friction seal to improve safety for motorists.
Work will be carried out between 7am and 6.30pm from Monday, April 1 to Friday, April, 5 weather permitting.
Traffic control and a reduced speed limit of 40 km/h will be in place for the safety of workers and motorists.
Motorists are advised to drive to the conditions, follow the directions of signs and traffic control and allow up to 10 minutes additional travel time
Roads and Maritime Services thanks the community for its patience while work is carried out.
For the latest traffic updates call 132 701, visit livetraffic.com or download the Live Traffic NSW App.